Pool removal · Peninsula & South Bay

Pool removal, permit to backfill.

In-ground pools and spas taken out by one licensed crew. Gas and electrical capped, the concrete shell and rebar broken out and hauled, and the yard filled back in.

Pool shell coming out

How a pool removal runs

Five steps.
One crew.

We walk you through the permit. Then the same crew runs the break-out, the haul-off and the backfill.

  1. Walk the yard

    Free on-site estimate. We look at the pool, the access for machines and where the gas and electrical run. You get a straight quote.

  2. Permit

    Most cities want a permit before a pool comes out. We handle permitted pool removals and walk you through what your city asks for.

  3. Utilities capped

    Gas and electrical to the pool are capped and removed before the shell is touched.

  4. Shell broken out

    The concrete shell and rebar are broken out, loaded and hauled off on our own trucks.

  5. Filled and graded

    The area is filled back in and graded flat.

From the job sites

Shell out.
Yard back.

Every photo and clip on this page is a real Mosso job.

  1. Deere excavator set up at the edge of an empty in-ground swimming pool
    Machine inExcavator at the pool edge
  2. Mosso crew member breaking up the concrete deck beside an in-ground pool
    Deck firstBreaking up the concrete around the pool
  3. Skid steer pushing broken concrete into a pile for loading
    Loaded outBroken concrete pushed up for loading
  4. Backyard graded flat after the concrete came out, with a compactor on the dirt
    Graded flatA backyard after the concrete came out
See more projects

Questions

Straight answers.

Something else? Call or text 650-880-5416, Mon–Sat, 7am–7pm.

Do I need a permit to remove a pool?

In most cities, yes. San Jose requires a building permit before a pool or spa is removed, and Santa Clara requires a grading permit. Rules change from city to city, so we check yours and walk you through it. We handle permitted pool removals on the Peninsula and in the South Bay.

What happens to the gas and electrical lines?

They are capped and removed as part of the job, before the shell is broken out.

What is left when you are done?

Dirt, graded flat. The concrete shell and rebar are broken out and hauled off, and the area is filled back in. If you plan to build on that spot later, tell us at the walk-through. Some cities ask for an engineer's compaction plan when the area will be built on.

What does it cost, and how soon can you start?

It depends on the pool, the access and what your city requires, so we price it on site. Estimates are free. We can usually start within 48 hours of your go-ahead. On permitted work the start date follows the permit.

Reviews

Five stars, in their words.

5.0on Google from 55 reviews. Also 5.0 on Yelp and Angi.
★★★★★

Very fast job and clean work. This is what I call someone you can rely on. Anderson was very knowledgeable and stood behind his quote and completed his contract.

Ephram A.Customer review
★★★★★

We've been using Mosso Demolition for over a year now… top-notch professional, efficient, and always friendly.

Sasan R.Repeat customer
★★★★★

Mosso is great to work with. They are hard working… Will hire them again. And again.

KeyurCustomer review

Licensed, bonded & insured

Check us out. Literally.

Every number here is public record. Look up our license on the Contractors State License Board any time.

Verify on CSLB
MOSSO LLCFoster City, CA
License
CSLB #1111834
Class
C-21 Building moving / demolition
Liability
$1,000,000 general liability
Workers' comp
State Compensation Insurance Fund
Motor carrier
USDOT #4124228

Where we work

Pool removal near you.

Based in Foster City, with our own trucks running jobs across the greater San Francisco Bay Area. Each city page has notes on local permits. Not sure we cover your address? Call and ask.

Pool in
the way?

Text a few photos and we'll tell you what it takes.

Call Free quote